At 6:45 PM Jackson got a call for a possible structure fire, it was quickly upgraded to a working garage fire "Fully Involved". First due engine was 5411 and they pulled a 2.5 and attacked the main body of fire with tank water while they worked on a water supply. The fire burned for about 30-45 mins with heavy fire finally breaking the roof line at the end. The cause of the fire is unknown. The final lay in was anywhere from 1500-2000ft to the hydrant seems like they did suffers some water pressure issues.
At 6:45 PM Jackson got a call for a possible structure fire, it was quickly upgraded to a working garage fire "Fully Involved".
First due engine was 5411 and they pulled a 2.5 and attacked the main body of fire with tank water while they worked on a water supply.
The fire burned for about 30-45 mins with heavy fire finally breaking the roof line at the end.
The cause of the fire is unknown.
The final lay in was anywhere from 1500-2000ft to the hydrant seems like they did suffers some water pressure issues.
Comments are closed.